The Maharashtra government has decided to make check dams a mandatory part of every new bridge built across rivers and streams under state and Central government projects, with a requirement that at least one metre of water be retained beneath each bridge. The decision was taken on Wednesday at a meeting of the Cabinet Sub-Committee on Drought Mitigation chaired by revenue minister Chandrashekhar Bawankule, amid severe drought and water shortage in the state.
Water resources minister Girish Mahajan, chief secretary Rajesh Agrawal and senior officials from various departments attended the meeting. Check dams are small barriers that slow the flow of water and store a limited quantity compared with dams. Bawankule said the aim is to raise water storage capacity and ensure that at least one metre of water is retained under every bridge.
The directive will cover new bridges constructed by the Public Works Department, the Maharashtra State Road Development Corporation, the Mumbai Metropolitan Region Development Authority, the City and Industrial Development Corporation, the Navi Mumbai Airport Influence Notified Area and those built under the chief minister's Gram Sadak Yojana. The government is also planning such bridge-cum-check dams along the proposed Shaktipeeth Expressway.
Bawankule said the government is considering proposals from gram panchayats to build small lakes of two to three acres each on grazing land to improve future water availability. The deadline for the Gaalmukt Dharan scheme, under which silt removed from gram panchayat, Zilla Parishad and Malgujari tanks is supplied free to farmers, has been extended to June 30. Rates have been fixed at ₹32 per cubic metre for silt removal and ₹37 per cubic metre for transportation, with the maximum subsidy capped at ₹37,500.
